1-800-472-2141
Wildfire mitigation plans
The following documents include wildfire mitigations plans for Verendrye Electric Cooperative and Central Power Electric Cooperative, which is the transmission cooperative that Verendrye works with.
The plans align with North Dakota Senate Bill 2339, passed in 2025, to establish a formal standard of reasonable care in electric utility wildfire mitigation